The tall units now have their doors in place and all the handles have been put on, the soil pipe and waste pipes have been out in for the downstairs toilet (though Steve blew up 3 drills going through our wall)! The worktop has been finished and it is starting to take shape fast.
In addition the porch has been started, bricks up to the damp-proof course have been laid and the cement floor put down to dry overnight.
No comments:
Post a Comment