Tuesday, 22 March 2016

Extension Day 51: All Above Board

The old part of the kitchen is starting to be prepared for a new coat of plaster, a new ceiling has been put up and the new downstairs toilet has been boarded. The pipes leading down to the old radiator by the door have been capped and removed as there will now be cupboards there. Also today was the chasing out and running of wires for the electricity points for the washing machine and tumble dryer (surprisingly I am missing those even more than the oven).

I think overall a new coat of plaster will make all the difference in the old room as I just can't wait to see the back of the artex which was everywhere in this house - will be such a novelty to have smooth walls again.