The timber structure for the walls of the downstairs toilet were built today and we can now see the size of it. We have more length than I pictured but just hoping the sink I have chosen will fit in, need to get the tape measure out.
The dishwasher has also been plumbed into the new position (so we can stop arguing over who is going to wash and dry) and the hidden cutlery drawers have been added to the deep drawer units - love them.
No comments:
Post a Comment