Today was about getting the soil pipe moved and connected to the new inlet into the sewer. The existing waste pipes have now been moved to run across the inside of the new roof (middle photo) and down the side where they connect to the sewer. In addition the rear wall has been re-bricked where the small chimney was taken out (top photo). Finally, t
he brackets have been fitted inside the velux openings ready for the roof (bottom photo).
No comments:
Post a Comment